دسته : -فنی و مهندسی
فرمت فایل : word
حجم فایل : 33 KB
تعداد صفحات : 8
بازدیدها : 170
برچسبها : پروژه تحقیق مبانی نظری
مبلغ : 1500 تومان
خرید این فایلParking Structure Foundation Pour Schedule Dec 10
The second major concrete foundation pour for the multilevel parking structure on the Santa Rosa Campus is scheduled for this
Saturday, December 10 from 7 AM to 7 PM. The same protocols and access restrictions are in place as they were last week to
ensure a successful activity.
It is still advisable, unless you have classes or business on the Santa Rosa Campus, to avoid accessing the college from
Mendocino Avenue, especially between Elliott Avenue and Ridgeway. We still anticipate considerable congestion between
Steele Lane and College during the construction hours, though it was managed very well last week.
Contractors, engineers, and college staff alike are very pleased with the significant and positive interest in this particular
project, and find that there’s a very active interest in the excavation work and foundation pours. The safest place to view
the construction activity of the parking structure is from the top of the east bleachers at Bailey Field looking down at the
construction site. This project is a real team effort, and we are quite pleased by the performance of our contractor, Wright
Contracting, Inc., and their subcontractors.
خرید و دانلود آنی فایل